Upper Gotvand Dam

Dam in Gotvand County, Khuzestan Province
32°15′58″N 48°56′09″E / 32.26611°N 48.93583°E / 32.26611; 48.93583StatusOperationalConstruction beganAugust 2004Opening date2012Owner(s)Iran Water & Power Resources Development Co.Dam and spillwaysType of damEarthfill damImpoundsKarun RiverHeight (foundation)180 m (591 ft)[1]Length760 m (2,493 ft)Width (crest)15 m (49 ft)Width (base)1,075 m (3,527 ft)Dam volume28,500,000 m3 (1.006468002×109 cu ft)Spillways4Spillway typeService, controlled ogee-typeSpillway capacity17,500 m3/s (618,007 cu ft/s)ReservoirCreatesUpper Gotvand ReservoirTotal capacity4,500,000,000 m3 (3,648,209 acre⋅ft)Catchment area32,425 km2 (12,519 sq mi)Surface area96.5 km2 (37 sq mi)Power StationCommission date2012TypeConventionalTurbines4 x 250 MW Francis-typeInstalled capacity1,000 MW (currently)
2,000 MW (with phase 2)Annual generation4,500 GWh

Upper Gotvand Dam, or simply the Gotvand Dam (Persian: سد گتوند بالا), is an embankment dam on the Karun River about 12 km (7.5 mi) northeast of Gotvand in Khuzestan Province, Iran. It currently has an installed capacity of 1,000 MW with another 1,000 MW in the works for a second phase. Studies for the Karun River began in the 1960s and specific designs on the Upper Gotvand were presented in 1967, 1975 and 1982. After the design and location were chosen, a further study was carried out in 1997, the same year preliminary construction (roads, bridges, river diversion) began. The river was diverted by April 2003 and excavation began soon thereafter. After completion of the dam, impounding of its reservoir began on 30 July 2011 during a ceremony attended by Iranian President Mahmood Ahmadinejad. The first generator of phase one was commissioned on 5 May 2012, two more by 18 September 2012 and the final in November 2012.[2][3] Ahmadinejad was again present for the dam's inauguration on 22 April 2013.[4] Phase 2 is estimated to be complete in 2015 and the dam is going to become one of Iran's largest power stations and is already its tallest earth-fill dam.[5][6]

Downstream of the Upper Gotvand Dam is the 22 m (72 ft) high Lower Gotvand Dam at 32°16′32.51″N 48°50′8.52″E / 32.2756972°N 48.8357000°E / 32.2756972; 48.8357000 (Lower Gotvand Dam). Constructed from 1975 to 1977, it serves to divert portions of the river into two canals for the irrigation of 42,000 ha (100,000 acres) of farmland.[7][8]

Objectives of dam construction

The goals of building this dam are:

Challenges

Before the water extraction of this dam, one of the important debates and disagreements surrounding the construction of this dam was that in the downstream part of this dam, the ground has salt veins and this can cause the saltiness of the water used by the cities and villages downstream.[11] Engineer Meshkat, a geologist and a member of the team that prepared the geological map of the dam, said that the design team was aware of the problem of the dam lake being located on salt masses. Also, Isa Kalantari, the former head of the Environmental Protection Organization, says: Before the revolution, the Americans examined the Gotvand dam from an environmental point of view and decided to build the dam 15 kilometers higher.[11] He believes that the executors of the Gotvand dam project should be tried for the error in the implementation of this project. He said to the students of Tehran University Geography Faculty and environmental activists: "The salinity of the water below the dam is 5.5 times the salinity of the water in the Persian Gulf, and nothing can be done to solve this problem."[11]

The effect of the Gotvand Dam on the salinity of the Karun River

Since before and after the water intake of Gotvand Dam, there have been criticisms about the salinization of the water of the Karun River by the lake of this dam due to its location on the Gachsaran formation and its proximity to the salt mountains. These criticisms had caused widespread concerns, and as a result, the dam's water intake had been postponed several times.[12][13]

Theories about dam environmental issues

  • Mehdi Qomshi, professor of water engineering at Chamran University of Ahvaz, says that the Gotvand dam will act like a time bomb.[14]
  • In the report related to the water institute of Tehran University, two national mistakes are pointed out: "Determining the axis of the dam without conducting water quality studies" and "Taking water from the dam despite the official opposition of the Environmental Organization and the letter of the National Inspection Organization".[15]

See also

  • flagIran portal
  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ "Upper Gotvand Project: Technical Information". Iran Water & Power Resources Development Co. Retrieved 6 January 2012.
  2. ^ "News: Third Unit of Gotvand connected to Iran's Power Grid". Iran Water and Power Resources Development Co. Retrieved 9 December 2012.
  3. ^ "News: Gotvand Hydro Generation More than 1300 GWhr". Iran Water and Power Resources Development Co. 27 April 2013. Retrieved 6 May 2013.
  4. ^ "News: Gotvand Dam and Hydropower Plant Inaugurated in the Presence of President Ahmadinejad". Iran Water and Power Resources Development Co. 29 April 2013. Retrieved 6 May 2013.
  5. ^ "Upper Gotvand Project". IWPCO. Retrieved 26 February 2011.
  6. ^ "News: Iran's Highest Earth-fill Dam Impounded in the Presence of President Ahmadinejad". Iran Water and Power Resources Development Co. Retrieved 3 September 2011.
  7. ^ "Susitna Hydroelectric Project" (PDF). Harza Engineering Company. Archived from the original (PDF) on 20 January 2015. Retrieved 20 January 2015.
  8. ^ "Gotvan regulatory barrier" (in Persian). Iran Dam Info. Archived from the original on 20 January 2015. Retrieved 20 January 2015.
  9. ^ "خانه - طرح گتوند". 2008-06-04. Archived from the original on 2008-06-04. Retrieved 2024-03-01.
  10. ^ TABNAK, تابناک | (2011-12-15). "همه چیز درباره سد گتوند". fa (in Persian). Retrieved 2024-03-01.
  11. ^ a b c "نمک موضوعی چالشی برای ساخت سد گتوند علیا/ آب کارون شورتر می شود". 2011-11-01. Archived from the original on 2011-11-01. Retrieved 2023-11-18.
  12. ^ "سد گتوند شوری آب کارون را ده برابر خواهد کرد | TRT Persian". 2023-03-11. Archived from the original on 2023-03-11. Retrieved 2024-03-15.
  13. ^ "بررسی‌و‌مدلسازی‌چالش‌سد‌گتوند‌علیا‌)هیدرودینامیک‌و‌شوری‌مخزن(‌ و‌ارائة راهکارهای‌مدیریتی". Archived from the original on 2023-03-11.
  14. ^ "مشاور استاندار خوزستان: سد گتوند مثل یک بمب ساعتی عمل خواهد کرد". 2023-03-08. Archived from the original on 2023-03-08. Retrieved 2023-12-13.
  15. ^ "شفاف سازی مهم رئیس موسسه آب دانشگاه تهران در خصوص سد گتوند- اخبار نفت و انرژی - اخبار اقتصادی تسنیم | Tasnim | خبرگزاری تسنیم | Tasnim". 2023-02-09. Archived from the original on 2023-02-09. Retrieved 2023-12-13.
Map all coordinates using OpenStreetMap

Download coordinates as:

  • KML
  • GPX (all coordinates)
  • GPX (primary coordinates)
  • GPX (secondary coordinates)
  • v
  • t
  • e
  • v
  • t
  • e
Major reservoirs and dams in Iran
Under construction
Ancient dams
Also See: Dams and reservoirs in Iran


Stub icon

This article about a dam or floodgate in Iran is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e
Stub icon

This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e

This article about an Iranian power station is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e